Pont-bascule
In serviceWeighbridge
Quantity: 1To be confirmed
The terminal
From quay to gate, every link in the handling chain runs on modern machines, maintained to the group’s standards.
A terminal’s reliability is measured by the availability of its equipment. MCTC renewed the entire fleet in its first year of operation [TO BE CONFIRMED]: the machines below were delivered in December 2024 and follow a planned preventive maintenance programme.
Weighbridge
Quantity: 1To be confirmed
Forklift truck
Quantity: 6To be confirmed
Terminal tractor & trailers
Quantity: 12To be confirmed
Empty container handler
Quantity: 2To be confirmed
Reach stacker
Quantity: 4To be confirmed
Mobile harbour crane
Quantity: 2To be confirmed
The 2025–2027 modernisation programme provides for the fleet to be reinforced as the terminal’s capacity ramps up [TO BE CONFIRMED for future equipment].